Paper instructions:

The CQ of a manufacturing facility evaluated batch of resistors. Thirty samples of five units each were taken from the lot and the value (in kg) was measured. The recorded data are summarized as follows: Sample 0.26 0.36 0.63 0.42 0.50 0.30 0.43 0.45 ESSENSOSURE OWN Sample Values 10.3 9.8 9.7 9.9 9.9 9.4 10.0 9.4 9.0 9.9 9.6 9.2 10.1 10.6 10.3 9.6 10.8 9.4 9.9 10.1 10.3 10.1 10.0 9.5 8.8 9.3 9.9 8.9 9.4 9.7 9.4 9.9 9.1 8.9 9.8 9.0 8.9 9.4 10.6 9.4 9.0 8.6 9.9 9.6 9.5 9.2 9.4 9.3 9.0 9.4 9.7 9.4 9. 4 9 .2 9.4 9.3 9.4 10.2 9.0 8.8 9.6 9.5 10.0 9.3 10.2 8.8 10.0 10.1 10.4 9.4 9.9 9.4 11.1 10.5 10.6 9.8 9.3 9.9 10.9 9.5 9.5 10.2 9.7 9.4 10.5 10.5 10.1 9.5 9.8. 8.9 9.6 9.8 9.3 9.7 10.3 10.1 10.2 9.6 8.8 9.9 10.8 9.5 10.5 10.5 10.4 9.9 10.1 9.9 11.0 10.8 10.1 9.2 10.3 10.0 10.6 10.0 10.9 10.6 9.9 10.0 10.2 10.2 10.6 9.7 10.1 9.8 9.3 10.5 9.3 8.7 10.5 9.6 8.6 9.7 10.2 9.4 10.1 9.9 9.4 10.6 10.0 10.3 9.6 9.7 10.2 10.1 10.9 9.9 11.1 10.8 9.98 9.78 9.66 10.06 10.06 9.94 9.24 9.78 9.22 9.40 9.52 9.40 9.22 9.40 9.52 9.56 9.84 9.80 10.28 10.04 9.76 10.18 9.54 9.82 9.74 10.28 10.24 10.20 10.40 10.44 0.36 0.74 0.75 0.16 0.43 0.19 0.66 0.27 0.59 0.42 0.68 0.69 0.34 0.41 0.37 0.39 0.58 0.50 0.42 0.72 0.46 0.46 0.8 1.0 TABLE A.8 Control chart constants Subgroup Size n BBDD 1.880 2.659 0.000 3.267 0.000 3.267 1.023 1.954 0.000 2.568 0.000 2.575 0.729 1.628 0.000 2.266 0.000 2.282 0.577 1.427 0.000 2.089 0.000 2.114 0.483 1.287 0.030 1.970 0.000 2.004 0.419 1.182 0.118 1.882 0.076 1.924 0.373 1.099 0.185 1.815 0.136 1.864 0.337 1.032 0.239 1.761 0.184 1.816 0.308 0.975 0.284 1.716 0.223 1.777 un WN 0.7979 0.8862 0.9213 0.9400 0.9515 0.9594 0.9650 0.9693 0.9727 1.128 1.693 2.059 2.326 2.534 2.704 2.847 2.970 3.078 1. Compute the LCL limits for the chart. 2. Compute the UCL limit for the R chart 3. Compute the upper 30 limit for the X-bar chart. 4. Compute the lower 36 limit for the X-bar chart. 5. Calculate the upper lo limit. 6. Calculate the lower lo limit. 7. Calculate the upper 20 limit. 8. Calculate the lower 20 limit 9. On the basis of the Western Electric rules, is the process mean in control? If not, when is it first detect to be out of control? a. The process is in control. b. The process is out of control for the first time on sample 9. c. The process is out of control for the first time on sample 7. d. The process is out of control in samples 19 and 26 respectively.

Never use plagiarized sources. Get Your Original Essay on
The CQ of a Manufacturing Facility Evaluated Batch of Resistors
Hire Professionals Just from $11/Page
Order Now Click here

Tired of low grades? We can help you write a successful essay that will boost your grades.
Order With Us Today!

Open chat
Lets chat on via WhatsApp
Hello, Welcome to our WhatsApp support. Reply to this message to start a chat.